Starrbuilt Custom Homes, LLC

Electrician - Mechanicville, NY

Average rating

info

4.71

4.7

based on 20 online reviews

Average rating

info

4.71

4.7

based on 20 online reviews
based on 20 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

New Home

Apr 2015

Began with vacant lot - Boundry survey, Septic design (Perc test), topographic - survey - House Plans - Obtained permit for construction, septic, curb cut, and fireplaces(2) - Cleared trees - Cut in driveway - Installed well ($8k) water softener - Constructed 2800 sq' ranch with 2800 sq' basement with 10' walls - & upgrades galore

$680k

Mechanicville, NY

Mud rm. / Laundry Conversion

Mar 2015

As the review states, we started with a very small entry/mud rm area with a very small laundry rm off it, we were asked to come up with a design to incorporate it all into one rm. Here's the scope of work: REMOVE, HAUL & DISCARD ALL CONSTRUCTION DEBRIS • REMOVE (2) WALL CABINETS & (1) BASE CABINET, CTOP & MISC. • DEMO ROOM TO CREATE ONE LARGE RM. • MOVE WASHER MECHANICALS BEHIND DRYER • MOVE DRYER CLOSER TO REAR WALL • PATCH SHEETROCK, TAPE & SMOOTH SAND, TRIM • SWITCH DOOR HANDING ON DRYER • CONSTRUCT BUILT-IN TO STACK DRYER ON WASHER • CONSTRUCT RIGHT & LEFT BUILT-INS PER DRAWING CONSTRUCT BARN DOOR: ➢ FRAME IN 2X6 INT. WALL- ROCK & TAPE, FINISH ➢ *36” X 8’0” PINE, PANELED DOOR ➢ (2) STAIN COATS (1) POLY ➢ SLIDING BARN DOOR HARDWARE NEW TILE FLOOR: ➢ REMOVE EXISTING FLOOR, DISCARD ➢ REMOVE TRIM, RE-INSTALL OR SUPPLY NEW & PAINT ➢ ¼” CEMENT BOARD UNDERLAYMENT ➢ 18” X 18” SPECIAL ORDER- CERAMIC TILES ➢ STRAIGHT JOINT GROUT ➢ SANDED GROUT ➢ STANDARD SPACING ➢ SANDED CAULK

$25k

Ballston Spa, NY

Built - In / hidden room

Jan 2014

Design and construct built in, hinged, cabinetry to hide a secondary room in a 102 year old home. When in the open position the cabinet folds back onto the secondary rooms walls to look like (2) separate book shelves. Oak & Maple hardwoods & vaneer were used in construction. The 8' tall by 5' wide opening was recreated in our woodworking shop, the cabinet was constructed and built to the precise measurements (The opening in the customers home was found to be out of square, proper adjustments were made to accommodate this) After completion in the shop and before installation in the customers home, it held a 160 lb man with only 1/16" of movement! (7) days to construct (1) day to install

$7k

Mechanicville, NY

BATH ROOM RENOVATION

Jan 2014

DEMO ENTIRE BATHROOM TO STUDS, INSTALL NEW 60" X 30" SHOWER UNIT WITH NEW DRAIN REPLACE (1) COPPER (T) ON COLD SIDE IN BASEMENT INSTALL NEW CHROME SHOWER FAUCET WITH HANDHELD SHOWER HEAD INSTALL MOISTURE RESISTANT SHEETROCK, TAPE TO A SMOOTH FINISH INSTALL NEW SHOWER DOOR NEW 48" VANITY WITH TOP & SINK NEW VANITY FAUCET NEW POWER FLUSH TOILET , COMFORT HEIGHT NEW MEDICINE CABINET NEW VANITY LIGHT FIXTURE NEW VINYL FLOORING (12X12 TILE LOOK) NEW BASE TRIM & CASING REMOVE IN-LINE WATER FILTER IN BASEMENT ADD GFI OUTLET IN PLACE OF STANDARD OUTLET NEW BATH ROOM ACCESSORIES (I.E. TOILET HOLDER, ROBE HOOK, TOWEL BAR) PRIME & PAINT WALLS: LIGHT COLOR CLEAN, HAUL & DISCARD ALL DEBRIS

$11k

Ballston Spa, NY