JAG Enterprises & Associates, Inc.

General Contractor - Melbourne, FL

5.0

5 reviews

5.0

5 reviews

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Melbourne FL, Total interior remodel

May 2015

Interior remodel, New Floors, New master Bath New guest bath. New showers, new cabinets and counter tops. New lighting, Dry wall, new tile. New pocket doors Moved Glass french doors. New plumbing. Enlarged room by removing a wall. Raised ceilings.

$35k

Melbourne, FL

West Melbourne, Master Bath and guest bath remodel

May 2015

Remodel of both master bath and guest bath. Moved wall and added unique over sized shower with tile niches. New counter tops.

$9k

West Melbourne, FL

Melbourne FL. Kitchen Remodel

Apr 2015

Kitchen Remodel, Removed and Replaced Cabinets Counter Tops and LED recess canned Lighting. Drywall repair. Painting

$3k

Melbourne, FL

Melbourne Beach FL Condo Remodel

Mar 2015

Complete renovation of condo. New Master bath and Guest Bath. New Kitchen , new counter tops, new cabinets,new Island with Lighting, under cabinet lighting. Master bedroom and walk in closet. New tile floors Dry wall and paint.

$30k

Melbourne Beach, FL

Bathroom Remodel

Aug 2015

Complete remodel of both main bathroom and master bathroom Remove top wallpaper border, remove tub unit, remove all floor and wall tile. Remove top of wall at end of old tub and remove vanity and top. Remove and relocate plumbing Provide electric for new tub pump unit. Remove mirror and cut down to fit new layout. Remove old exhaust fan and install new fan unit. Patch and texture drywall prime and paint Install new vanity, wall cabinet and counter. Install a section of open shelves. Tile floor and around new tub unit and install transitions strip at door opening. Install bath accessories and plumbing fixtures. Master Bath Remove top wallpaper border, remove wall and floor tile, vanity, counter and cut top of wall between vanity and toilet Remove and cut down mirror to fit new layout. Reframe shower area as per new layout. Drop shower curb as low as possible Install new shower drain, shower valve and plumbing for new vanity. Add GFI. and Install new lighting over vanity. Patch and texture drywall and install duro-rock in shower area. Note: Shower area to have (2) recess shelf areas Install new floor tile, shower pan tile and shower wall tile. Install fix glass and a (30) shower door in the new shower area. Install bath accessories and plumbing fixtures Install new vanity, counter and wall cabinets.

$12k

Merritt Island, FL

Rockledge FL Whole Home Remodel

Apr 2015

Total home remodel. Roof Repair,All doors and windows replaced including garage door. Entire home floors tiled. All new kitchen cabinets counter tops and appliances. Entire home painted. New fans installed in every room. New lighting installed.

$32k

Rockledge, FL

Guest Bath and Master Bath

Jan 2013

) Master Bath Remove wall tile on (2) walls from the shower floor Install new duro-rock and wall tile, in repaired area. Repair the damaged drywall on the exterior area of shower Guest Bath Remove wall tile and drywall on (3) walls from top of tub up (22- 24). Replace shower valve and fixture. Install new duro-rock and (4 x 4 ) wall tile, in repaired areas.

$3k

Merritt Island, FL