Astar Heating & Air Conditioning, Inc.

HVAC Company - Middletown, NY

Average rating

info

4.90

4.9

based on 2,010 online reviews

Average rating

info

4.90

4.9

based on 2,010 online reviews
based on 2,010 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

J&G - heat exchanger replacement

Jan 2015

REPLACE COMPLETE HEAT EXCHANGER WITH ALL ASSOCIATED CONTROLS STARTED UNIT UP AND TESTED OPERATION.

$8k

Walden, NY

Marilyn M - oil boiler installation

Nov 2014

Retrofit installation of home heating system to include: * Installation of one (1) Lennox model COWB3-3 oil fired boiler s/n 8713H01376,, sized properly for the home, with a low fire AFUE efficiency rating of 85.0% to be placed where existing unit is now in basement * Installation of one (1) Lennox tankless coil in new Lennox boiler for domestic hot water * All boiler close piping to be removed and re-piped with new copper and black pipe * Boiler package to include expansion tank, Watts feeder valve, relief valve and new zone valves * Installation of Spirovent air elimination package * Installation of Two (2) digital programmable T-stat for existing zone * All venting to be done with stove pipe and tie into existing chimney * All transitional fuel lines, electric, and hydronic piping to tie into existing * Removal and disposal of old boiler including all gate valves, and assorted electronics and controls for old boiler * Start up and operational check on all equipment installed/ Commission Systems

$7k

Chester, NY

Rocco C oil boiler installation

Oct 2014

Installation of a new home heating system to include the following: * One (1) Buderus model G115WS oil fired boiler, with a Beckett NX burner, sized properly for the home, with an AFUE rating up to 87% * Installation of a Beckett fresh air kit to the new burner, all piping is to be done with hard stove pipe to the outside including a barometric relief * New boiler package to include expansion tank, water feed valve, low water cutoff, aquastat, and relief valve * One (1) Spirovent air elimination system is to be installed * New zone valves ( Six (6) total and one full port zone valve), circulator, smoke pipe, barometric damper, temperature/pressure gauge * Two (2) Taco zone control panel including all necessary low and line voltage wiring * Installation of new supply and return manifolds with new ball valve shutoffs, and a purging system * All transitional fuel lines to tie into the existing, including new firematic oil shutoffs * All transitional electric to tie into existing, including a new low voltage transformer * All transitional venting to tie into the existing chimney,including a barometric damper,inspect the existing chimney * All transitional hydronic piping to tie into the existing piping to the house * One (1) Buderus Logomatic 2107 control with outdoor reset and domestic hot water priority including all line and low voltage wiring * One (1) Dunkirk 60 gallon stainless steel indirect water heater including new ball valve shutoffs, aquastat, low voltage wiring, drain valve, and all transitional piping * Remove and dispose of the old boiler and water heater * Start up and operational check, including a combustion analysis test

$14k

Westtown, NY

Jack V. - Installation of furnace, a/c, humidifier, air filter

Oct 2014

Installation of Home Comfort System to include the following: * One (1) Lennox model EL296UH135XE60D Elite Series natural gas furnance, s/n 5914J07670,with ECM Blower, Two Stage producing both 86,000 BTUH and 135,000 BTUH with an AFUE efficiency rating of 96%, to be placed where existing unit is now in downstairs mechanical area * One (1) Lennox model CX34-48 evaporator coil, s/n 6014E47849, to be placed on top of new furnace in mechanical room brazed into new lineset * One (1) Lennox model 13ACX-048-230 condensing unit , s/n 1914F57459, to be placed on a pad outside of home with whip, disconnect, and hard start kit filled to manufactuer spec with R410A * Installation of Lennox high efficiency HealthyClimate Merv 11 Filter * (1) One two stage digital programmable Lennox ComfortSense 5000 thermostat * Installation of lineset insulated in Armaflex to be ran from condensing unit to evaporator coil * All transitional duct work to be done in insulated duct board * All for venting for both fresh air and exhaust to be done in pvc via sill plate * All transitional natural gas piping to the new furnace including a shutoff and sediment trap to be run in either schedule 40 black pipe or CSST connecting into existing service and bonded to the panel * All transitional low voltage and line voltage electric to tie into existing * Removal and disposal of old equipment * Start up and operational check

$12k

Middletown, NY

Henry Z. Furnace replacement

Sep 2014

Installation of Home Comfort System to include the following: * One (1) Aire-Flo model 92AF070UH36B natural gas furnance, producing 66,000 BTUH with an AFUE efficiency rating of 92%, to be placed where existing unit is now in basement * One (1) Aire-Flo model AC24E1B evaporator coil, s/n 7114G02230, to be placed on top of new furnace in mechanical room brazed into lineset * Installation of Lennox high efficiency HealthyClimate Merv 11 Filter * One (1) digital programmable Lennox ComfortSense 3000 thermostat * All transitional duct work to be done in insulated duct board * All for venting for both fresh air and exhaust to be done in pvc via sill plate * All transitional natural gas piping to the new furnace including a shutoff and sediment trap to be run in either schedule 40 black pipe or CSST connecting into existing service and bonded to the panel * All transitional low voltage and line voltage electric to tie into existing * Removal and disposal of old equipment * Start up and operational check

$5k

Middletown, NY

Arthur W. Furnace installation

Jul 2014

Retrofit installation of Home Comfort System to include the following: * Installation of one (1) Lennox Elite Series model EL296UH090XE36B, ECM blower motor, natural gas furnance, s/n 5914H28109, producing both 57,000 BTUH and 88,000 BTUH, with a AFUE efficiency rating of 96% to be placed where existing is now * All transitional ductwork to tie into existing using insulated ductboard * All duct work to run from supply and return plenums to be done in flex rated to R8 insulation value including all necessary boots, grilles, diffusers, etc. * Installation of Lennox HealthyClimate Merv11 high efficiency filter and cabinet * Installation of one (1) Lennox ComfortSense 5000 digital programmable thermostat * All transitional venting for exhaust and fresh air intake to be done in PVC via sill plate * All transitional natural gas piping to the new furnace including a shutoff and sediment trap to be done in schedule 40 black pipe or CSST and bonded to panel * All transitional low voltage and line voltage electric to tie into existing * Start up and operational check

$9k

Port Jervis, NY

James & Mary C. - Central AC installation

Jun 2014

Installation of an air conditioning system to include the following: * One (1) Lennox model ACX-13 -036-230, 3 ton condensing unit, using R-410A refrigerant to be placed on a pad outside the home * One (1) Lennox air handler, model CBX25-036 air handler, is to be placed in the attic * One (1) Hard Start Kit to be installed to the condensor including all wiring * Installation of a thermal expansion valve to the new evaporator coil * Installation of drain pan, anti-vibrate blocks, all transitional condensate lines, emergency kill switch, and an EZ-trap water safety * New supply ductwork consisting of insulated ductboard is to be installed in the attic, all the ductwork is to be up to NYS code with an R-value of 8, including dampers and flexible runs to each of the new registers * Installation of supply registers on the 1st floor, living room, kitchen, dining room, and family room 2nd floor: master bedroom, and three (3) additional bedrooms (all down runs are to be run through the 2nd floor closets) * Installation of a return air grille in the 2nd floor hallway including a return air box, flexible connection, and collars * Installation of a new Line-set to run from the air handler to the condensing unit, to also be wrapped with Armaflex * All transitional line set connections to be brazed and properly vacuumed to 400 microns or more and filled to manufacturers specifications * All transitional electric is to be tied into the existing panel box * Installation of a weatherproof electrical whip and disconnect * One (1) Duct Performance Test is to be done with a calibrated ShortRidge draft hood * Start up and operational check of the air conditioning system

$14k

Washingtonville, NY

Joyce V - Generator installation

Apr 2014

Installation of Kohler Generator to include the following: * One (1) Kohler 20KW propane gas fired residential generator to be installed, the generator will be placed 3 feet from the brick chimney or 5 feet from the house (vinyl) * Installation of a Kohler Load Control Module is to be installed in the basement * Installation of a Kohler OnCue home management system is to be installed including all transitional wiring from the generator to the existing modem, including cat5 wire * A base is to be made and will consist of a pressure treated frame and river rocks in which the generator will be placed upon, the wood is going to be pressure treated 4x4, or 5x4 * Installation of One (1) heater to the above generator * Installation of One (1) 200 amp whole house automatic transfer panel to be installed in the basement * One (1) Interstate or equivalent 12 volt batteries * All transitional electric from the existing panel box to the new generator * All gas piping to be done with either CSS or schedule 40 black pipe and is to tie into the new propane gas supply, including a sediment trap, gas shutoff, and flexable connection to the generator. Gas piping is to be bonded as necessary. Gas lines are to be pressure tested and leak checked * When complete a full amp draw is to be performed on the generator, and is to be checked on each leg. * Start up and operational check of the generator

$16k

Montgomery, NY

SP Richards - rooftop HVAC replacement

Mar 2014

Retrofit installation of 4 rooftop package to replace units with cracked heat exchangers to include: * 4 Lennox rooftop package units either KGA120S4BH Landmark standard efficiency, rooftop package units, using R410A refrigerant, producing 10 tons of cooling and 240,000 Btuh of heat each to be placed on an adapter curbs on roof by crane where existing units are now * Outdoor air economizer to be installed on each unit * New electrical outdoor disconnects to be installed * Tie into existing gas piping with either schedule 40 black pipe or flexible stainless steel * Duct performance test on new units * Full operational check on Zonex building management system including retrofit of Zonex system to new units * Removal and disposal of existing units, including recovery and disposal of refrigerant * All required permits and inspections to be obtained by Astar * Start up and operational check

$54k

Middletown, NY