SSC Inc.

General Contractor - New River, VA

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Christiansburg Church Renovation

Jul 2014

Removed wall and expanded door opening to 12 ft and interior painting.

$3k

Christiansburg, VA

Radford Belltower renovation and more

Jul 2014

Bell tower restoration, roof repair and bathroom renovation with tile work.

$22k

Radford, VA

Blacksburg Bathroom Remodel

Apr 2014

Complete bathroom remodels with new flooring and fixtures. Deck remodel changing wood to veranda flooring.

Blacksburg, VA