General Contractor - New York, NY
5.0
We turn your dreams into reality . We are experts in bathroom and kitchen renovations also commercial spaces and full ground up projects.
anthony b.
My experience with All City construction was amazing they are very clean when working they protected all my valuables and did amazing work in my apartment on Park Avenue. I asked for a high end paint job but i was not expecting for the paint job to exceed my expectations.
Address
45 Rockefeller Plz Ste 2000
New York, NY 10111
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
1095 park ave | Feb 2016 | Level 5 skim coat on all walls and ceilings. sand down all moldings and doors, use ready patch on wood moldings and wood doors. Had to you use ready patch to the walls before skim coat because walls were contaminated. | $28k | New York, NY | |
Saks 5th avenue | Dec 2015 | all weather stripping all exterior and interior doors also brand new security window frame and window replace and prefabricated off site | $20k | Nyc, NY | |
Delta airlines mechanics office in laguardia airport | Nov 2015 | skim coated both office and filing room. painted office delta red with black doors and white ceilings. also removed 4 by2 light fixtures replaced with 2 by2 L.E.D light fixtures. Also replaced drop down ceiling grid and panels. changed location of switch and troubleshooted electrical problem with sensor switch. Installed brand new carpet with carpet based molding | $15k | Queens, NY | |
muse hotel | Nov 2015 | changed all piping for down feed sprinkler system that runs of the water tank on roof. Put in brand new galvanized 6" grooved pipe with two 6" osny valves and two 6" chack valves . Also preformed a sprinkler stand pipe test on fire departments Siamese pipes, with a certified S12 and S13 certificate approved by Nyc Department of Buildings. | New York, NY | ||
saks 5th avenue | Nov 2015 | put all weather stripping aroun all 46 exterior gold doors. | New York, NY | ||
sweet greens | May 2015 | Put a used 4 bay commercial slop sink and put new drains for all 4 bays and also left room between the slop sink and drain so no back flow would enter the slop sink where food is prepared. All plumbing is strictly by NYC code | New York, NY | ||
muse hotel | Nov 2015 | Changed all piping from down feed sprinkler tank system on top of roof. replaced with two brand new 6" osny valves and a check valve. Also did a sprinkler stand pipe test for fdny stand pipe with an s12 and s13 permit. | Nyc, NY | ||
Delta airlines mechanics office in laguardia airport | Nov 2015 | put new lights new drop down ceiling panels and grids. Painted both filing room and office room and also laid carpet in both rooms also put carpet based molding. | Queens, NY | ||
Delta airlines mechanics office in laguardia airport | Nov 2015 | put new lights new drop down ceiling panels and grids. Painted both filing room and office room and also laid carpet in both rooms also put carpet based molding. | Queens, NY |