all city construction and consulting group

General Contractor - New York, NY

5.0

1 review

5.0

1 review

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

1095 park ave

Feb 2016

Level 5 skim coat on all walls and ceilings. sand down all moldings and doors, use ready patch on wood moldings and wood doors. Had to you use ready patch to the walls before skim coat because walls were contaminated.

$28k

New York, NY

Saks 5th avenue

Dec 2015

all weather stripping all exterior and interior doors also brand new security window frame and window replace and prefabricated off site

$20k

Nyc, NY

Delta airlines mechanics office in laguardia airport

Nov 2015

skim coated both office and filing room. painted office delta red with black doors and white ceilings. also removed 4 by2 light fixtures replaced with 2 by2 L.E.D light fixtures. Also replaced drop down ceiling grid and panels. changed location of switch and troubleshooted electrical problem with sensor switch. Installed brand new carpet with carpet based molding

$15k

Queens, NY

muse hotel

Nov 2015

changed all piping for down feed sprinkler system that runs of the water tank on roof. Put in brand new galvanized 6" grooved pipe with two 6" osny valves and two 6" chack valves . Also preformed a sprinkler stand pipe test on fire departments Siamese pipes, with a certified S12 and S13 certificate approved by Nyc Department of Buildings.

New York, NY

saks 5th avenue

Nov 2015

put all weather stripping aroun all 46 exterior gold doors.

New York, NY

sweet greens

May 2015

Put a used 4 bay commercial slop sink and put new drains for all 4 bays and also left room between the slop sink and drain so no back flow would enter the slop sink where food is prepared. All plumbing is strictly by NYC code

New York, NY

muse hotel

Nov 2015

Changed all piping from down feed sprinkler tank system on top of roof. replaced with two brand new 6" osny valves and a check valve. Also did a sprinkler stand pipe test for fdny stand pipe with an s12 and s13 permit.

Nyc, NY

Delta airlines mechanics office in laguardia airport

Nov 2015

put new lights new drop down ceiling panels and grids. Painted both filing room and office room and also laid carpet in both rooms also put carpet based molding.

Queens, NY

Delta airlines mechanics office in laguardia airport

Nov 2015

put new lights new drop down ceiling panels and grids. Painted both filing room and office room and also laid carpet in both rooms also put carpet based molding.

Queens, NY