STAMPEDES ELITE HANDYMEN

Handyman - Norman, OK

Average rating

info

4.90

4.9

based on 70 online reviews

Average rating

info

4.90

4.9

based on 70 online reviews
based on 70 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

PLAYSETS ASSEMBLY AND CONSTRUCTION

May 2022

This playset required intense leveling - the hill it sits on has a steep decline that forced us to use stilts. Material and extra for labor leveling.

$899

Oklahoma City, OK