Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Half bath

Feb 2019

Update half bath

$4k

Old Hickory, TN

Full bathroom remodel

Oct 2018

Gutted entire bathroom to studs. Installed pocket door. Reconfigured space to accommodate shower and smaller closet.

$15k

Old Hickory, TN

Sun Room Addition + Deck

Jun 2016

Demoed existing modular sun room that was sitting on a sinking pad. We demoed the existing pad and excavated the super saturated soil up against the house. Then we built it back up in layer compacting as we went and installed a french drain. We then poured spot footers and built an 20ft x 14ft sun room attached to the house and tied the roofs together. Once the sun room was complete we built a 10ft x 20ft deck platform

$40k

Mt Juliet, TN

Master bathroom update

Aug 2017

New floor and tub surround tile. New vanity. Paint and crown. Update fixtures and accessories

Old Hickory, TN

Double jaccuzi

Apr 2017

bathroom gut and remodel. Desperately needed an update

Old Hickory, TN

Master bedroom conversion

Apr 2017

We converted the master bedroom into two smaller rooms with a hall. Also framed a closet in the larger bedroom. Framing/ drywall/ and primed the walls. They hired their own paitner.

Old Hickory, TN

Bathroom remodel (Mt. Juliet)

Dec 2016

We gutted everything but the vanity, top, and sink. The home owner wanted to re-finish them himself. We installed a new tub with 3 wall surround in tile. We tiled the floor and replaced the toliet, vanity mirror, vanity light, and faucet. We also painted.

Mount Juliet, TN

Bathroom build in previously converted garage

Nov 2016

We were asked to build a master bathroom in a garage that had previously been remodeled into a large living area. We created a design and some digital models of the project. Where we built the bathroom created a hallway and a way to separate the space from the mudroom/ side house entrance. We also built a closet.

Hermitage, TN

Kitchen remodel

Oct 2016

Gut the entire kitchen. We did a drywall overlay and installed new cabinetry and flooring and re textured the ceiling. Then painted ceiling walls and trim.

Nashville, TN