Olympia Construction Inc.

Roofing Contractor - Olympia, WA

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Roofing Services

Dec 2013

Re-Roof

$7k

Spanaway, WA

Rauh

Nov 2013

Underlayment: Install High-Temp Ice and Water shield on parapet wall sections of roof. Install FRU10 TPO underlayment on low slope section of structure. Install tapered cricket system on two existing flat decks to promote proper drainage. Roofing: Install 26 gauge, 12" snap lock, standing seam metal on mansard parapet walls surrounding building structure and complete by using matching trim package . Install 60 mil TPO membrane roof as per manufactures specifications excluding the two Dura-last membrane roofing decks. Flashing: Replace all flashings with new 26 gauge flashings at roof to wall junctions to match new metal roof. Roof Drains: Install all new 4" bolt in roof drains utilizing screw in debris caps. Cut in and install TPO clad, 4", through wall, overflow drains to meet or exceed requirements for flat roof Drainage excluding the two Dura-last membrane roofing decks. Final: Magnetically sweep job site. Haul away all job related debris.

$35k

Olympia, WA

Olszyk

Nov 2013

Underlayment: Install 15# premium fiberglass reinforced code approved underlayment. Install CertainTeed weather watch ice and water shield in valleys and around all roof penetrations. Roofing: Install CertainTeed Landmark algae resistant architectural shingles as per manufactures specifications using full headed barbed roofing nails. Trim all hips and ridges using matching CertainTeed cap shingles. Flashing: Replace all non permanent flashings with new 26 gauge flashings at roof to wall junctions and skylights. Install new metal based plumbing boots, seal all vent pipes, and chimney flashings. Balanced ventilation: Install new RVO-38 metal vent system to meet or exceed code standards. NOTE: Vents along lower roof will be filled using CDX plywood and continuous vented roof to wall will be installed in its place. Final: Magnetically sweep job sight. Clean gutters of all job related debris. Haul away all job related debris.

$9k

Olympia, WA

Weidenheimer

Nov 2013

Roof Preparation: Cover/Tarp and remove 1 layer of roofing material per visual inspection. Inspect decking for rot or deterioration. Re-nail and secure existing decking if necessary. Clean roof deck to provide smooth nailing surface. Remove existing OSB Plywood Soffit and install rough sawn plywood to all soffits. NOTE: Additional cost for wood replacement will be ($8.00 per foot for plank decking, fascia, and trim boards or $42.00 per sheet of plywood) Underlayment: Install 15# premium D266 type 1 ASTM code approved underlayment to entire roof surface. Install CertainTeed WinterGuard Ice and Water Shield in valleys and around all roof penetrations to help promote a lasting water tight roof assembly. Roofing: Install CertainTeed Landmark algae resistant architectural shingles as per manufactures specifications using full headed barbed roofing nails. Trim ridges using matching CertainTeed cap shingles. Flashing: Replace all non permanent flashings with new 26 gauge flashings at roof to wall junctions. Install new metal based plumbing boots, chimney flashings, and B-Gas Flashing. Skylights: Replace existing units with low-E argon gas filled crystal skylights x 2. Balanced ventilation: Install new RVO-38 metal vent system to meet or exceed code standards. Gutter System: Replace existing system with new continuous aluminum 5" K gutters and 2 X 3 downspouts. Install sentinel leaf screens. Final: Magnetically sweep job site. Clean gutters of all job related debris. Haul away all job related debris.

$11k

Spanaway, WA

Ladenburg

Nov 2013

Roof Preparation: Cover/Tarp and remove 1-2 layers of roofing material per visual inspection. Inspect decking for rot or deterioration. Re-nail and secure existing decking if necessary. Clean roof deck to provide smooth nailing surface. NOTE: Additional cost for wood replacement will be ($8.00 per foot for plank decking, fascia, and trim boards or $42.00 per sheet for plywood) Underlayment: Install Sharkskin ultra synthetic underlayment to entire flat roof surface as a slip sheet. Insulation: Install 2 layers of 2 poly-iso insulation board, offsetting all seems, and fastening as per manufactures specifications. Fill any and all voids with expanding foam to maintain an airtight insulation installation. Build and install tapered cricket systems at gutter edges, cricket, and behind chimney to create positive water drainage of new roof membrane. Roofing: Install 60mil WeatherBOND TPO as per manufactures specifications using the required number of screws and barbed plates. Build any and all needed wrap-flashings, corners, and boots out of matching WeatherBOND materials as needed. Flashing: Replace all cap flashings with new 26 gauge flashings around perimeter of roof. Terminate wall membrane and chimney using aluminum termination bar. Cut in and install new chim-12 continuous counter in chimney. Install new high hat clad metal flapper vent for range/bathroom. Install new 3 clad TPO drains to replace existing. NOTE: Up graded 3 downspouts Added $260.00 Final: Magnetically sweep job site. Clean gutters of all job related debris. Haul away all job related debris.

$14k

Shelton, WA

Roofing Services

Nov 2013

Re-Roof

$5k

Spanaway, WA

Hollis

Oct 2013

Cover/Tarp and remove 1-2 layers of hot tar roofing material per visual inspection Install Secure Rock to the entire roof surface to provide code required 1 hour fire rating Install Versico 60 mil TPO as per manufactures specifications using full 4 perimeter sheets and 10 center sheets for single story wind uplift requirements and screw down to code

$11k

Yelm, WA

Loquvam

Nov 2013

Roof Preparation: Cover/Tarp and remove 1 layer of roofing material per visual inspection. Inspect decking for rot or deterioration. Re-nail and secure existing decking if necessary. Clean roof deck to provide smooth nailing surface. NOTE: Additional cost for wood replacement will be ($8.00 per foot for plank decking, fascia, and trim boards or $42.00 per sheet for plywood) Underlayment: Install 15# premium fiberglass reinforced code approved underlayment. Roofing: Install Pabco Premier architectural shingles as per manufactures specifications using full headed barbed roofing nails. Trim all hips and ridges using matching Pabco cap shingles. Flashing: Replace all non permanent flashings with new 26 gauge flashings at roof to wall junctions. Install new metal based plumbing boots, seal all vent pipes, and chimney flashings. Balanced ventilation: Install new Continuous ridge vent system to meet or exceed code standards. Final: Magnetically sweep job sight. Clean gutters of all job related debris. Haul away all job related debris. NOTE: New 5' continuous gutter and down spout system Leaf solutions leaf screens

$10k

Lacey, WA

Philbrook

Nov 2013

Roof Preparation: Cover/Tarp and remove 1 layer of roofing material per visual inspection. Inspect decking for rot or deterioration. Re-nail and secure existing decking if necessary. Clean roof deck to provide smooth nailing surface. NOTE: Additional cost for wood replacement will be ($8.00 per foot for plank decking, fascia, and trim boards or $42.00 per sheet for plywood) Underlayment: Install 15# premium D266 type 1 ASTM code approved underlayment to entire roof surface. Install CertainTeed WinterGuard Ice and Water Shield in valleys and around all roof penetrations to help promote a lasting water tight roof assembly. Built in gutter system: Install synthetic slip sheet underlayment. Install 3" TPO clad roof drains. Install Versico 60 mil TPO roofing as per manufactures specifications. Trim gutter in 2" 26 gauge cap metal color to match. Breezeway Roof: Install Suntuf polycarbonate roofing panels as per manufactures specifications. Color: Customers Choice Roofing: Install CertainTeed Landmark algae resistant architectural shingles as per manufactures specifications using full headed barbed roofing nails. Trim ridges using matching CertainTeed cap shingles. Flashing: Replace all non permanent flashings with new 26 gauge flashings at roof to wall junctions. Install new 26 gauge gable and pitch change metal. Install new metal based plumbing boots and seal all vent pipes. Install new chim-5 continuous counter flashings on existing chimney. Balanced ventilation: Install new RVO-38 metal vent system to meet or exceed code standards. Final: Magnetically sweep job sight. Clean gutters of all job related debris. Haul away all job related debris.

$13k

Olympia, WA