General Contractor - Petersburg, MI
Average rating
4.90
4.9
Average rating
We are a local Construction & Remodeling Company, with a focus on exceeding every customer's expectations. We provide a personal experience that allows our customers the opportunity to express.there individual style's and taste. We specialize in medium to large high-end custom projects including but not limited to Kitchens, Bathrooms, Basements, Additions & Decks.
Average rating
Address
5896 Teal Rd
Petersburg, MI 49270
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
McCormick - New Custom Marble Shower & Floor | Jan 2015 | Complete Bathroom Remodel with full marble shower and floor | $9k | Maumee, OH | |
Shultz - Custom Lumber Deck & Structural Repair | Oct 2014 | Design & Build Custom Lumber Deck with storage shed underneath. | $10k | Maumee, OH | |
Mangan 4-Season Room Addition | Sep 2014 | Removed old slab and 2 aluminum walls and rebuit entire structure with dimensional lumber. Created a heated 4 season room sunroom. | $13k | Toledo, OH | |
Hayden | Jun 2014 | Ground Level Composite Deck surrounding partially in-ground pool. | $11k | Toledo, OH | |
Boyer | Mar 2014 | 2 tone Latitudes Composite deck & handrails/balusters. Decking boards ran with a picture frame pattern around perimeter and inlayed on a 45 degree angle. I matched the pattern on stair landing. | $18k | Petersburg, MI | |
Olander | Nov 2013 | Design, Draft & Construct large custom partial composite deck | $22k | Sylvania, OH | |
McKenzie Custom Kitchen | Aug 2013 | Completely gutted and reconstructed kitchen - dinning area/bar. ITWMS COMPLETED DURING PROJECTS *Updated all Electrical to meet all building codes. *Updated all Plumbing to meet all building codes. *Installed seperate Heating/Cooling Zone for kitchen. *Framed new pantry and L-shaped island. *Installed proper ceiling/wall insulation/vapor barrier. *Hung new Drywall. Finished and painted all drywall. *Installed new 3/4" T & G hardwood flooring. *Installed all Upper & Lower cabinets. *Had new granite countertops fabricated & installed. *Installed custom backsplash with glass mosiac tiles. *Installed new glass pantry doors & interior doors. *Cut & hung all custom molding, including wine rack. *Installed all appliances. | $65k | Toledo, OH | |
Manol Fireplace | May 2013 | We started by tearing down and restructuring/building new fireplace walls. Covered walls with concrete board and installed solid stacked stone over entire facing. We bolted a rough sawn cedar 6 x 6 in place as the mantel. We also installed 2 IC rated recessed lights in ceiling and controlled them with a dimmer switch. | $5k | Toledo, OH | |
Tracy & Terry Jones | Mar 2013 | New Bathroom with Custom built & tiled shower. | $14k | Holland, OH |