Hinton Mechanical Inc

HVAC Contractor - Philadelphia, PA

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

High Efficiency Gas furnace

Mar 2010

Complete conversion from Hydronic boiler to high efficiency gas furnace with all insulated ductwork and AC installation

$6k

Philadelphia, PA

Complete Vanity Installation

Jul 2009

Installed complete new copper drain,supply lines, shut off valves,,faucet sink and vanity.

$487

Philadelphia, PA

Installed a oil boiler and a high efficiency low mass Gas boiler

Apr 2011

Removed an antiquated oil fired boiler and replaced with a low mass high efficiency gas boiler as primary heat and an oil fired boiler as a back up system.

Philadelphia, PA

Boiler Installation

Aug 2010

Downsized a boiler to separate two units into two separate heating systems with separate utilities

Philadelphia, PA

High Efficeincy Gas furnace

Mar 2010

New complete installation

Philadelphia, PA

Water Heater Installation gas and electric

Oct 2008

installed gas water heater and and electric to separate a duplex

Philadelphia, PA