General Contractor - Southfield, MI
Average rating
4.59
4.6
Average rating
Tri-Pups, Inc. is a Design, Remodel, and Repair company that has happily served both residential and commercial customers throughout Metro Detroit since 1997. Our goal is to provide a unique customer experience that focuses on communication and honesty while providing outstanding quality at a reasonable price. "A Working Dog is a Happy Dog!" is not just a slogan it is our company philosophy! In addition to our Architectural Design Services we offer the following Residential Services: Basement Finishing Bathroom and Kitchen Remodeling Ceiling Grid and Acoustical Tile Installations Ceramic Tile Installation Closet Makeovers Countertop Installs Custom Cabinetry Design and Installation Deck Building Demolition and Disposal Services Door and Window Installations Drywall Hanging and Finishing Electrical Installation and Repairs Fence Installation and Repairs Flooring Installation and Repairs Glass Block Installation Handicap Alterations Handyman Work Home Inspections Insulation Services Insurance Restoration Landscaping Design and Installation Painting Paver Installation Plumbing Power Washing and Sealing Rough Framing with Wood or Metal Studs Routine Maintenance Siding and Gutter Installation and Repairs Troubleshooting of Building Systems Window Covering Installations Here is the list of Commercial Services Offered: Complete Interior and Exterior Renovations of Office and Retail Space Demolition and Disposal Facilities Maintenance and Repairs Alterations to comply with ADA Standards Staff Relocation Services Utilizing Comprehensive Move Management Procedures Emergency Repairs Insurance Restoration
Average rating
Address
25580 Farmbrook Rd
Southfield, MI 48034
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
Troy Bathroom Wall Repairs | Nov 2014 | The walls surrounding the bathtub had tiles that were loose or cracked. We were called in to see what could be done to correct the problem. We found that the drywall behind the tiles was wet and rotting. The homeowner hired us to remove all of the tile and the substrates down to the studs. We installed Durock, Schluter Kerdi waterproofing membrane, and new tiles. The Homeowner later hired us to patch and paint the walls and ceiling and repair the toilet within this bathroom as well. | $3k | Troy, MI | |
Royal Oak Paver Makeover | Jul 2014 | After years of neglect, these backyard pavers required extensive cleaning. A 4' x 4' small section of the pavers had sunk so we pulled them all out, added slag, and re-installed them. After allowing the pavers to dry out for a few days, we returned to properly seal them. | $3k | Royal Oak, MI | |
Belleville Design/Build of Kitchen and Bathroom | Jan 2014 | We worked with the Homeowner to design the Kitchen and Bathroom of his dreams. We had several meetings to discuss his budget,the look that he was trying to achieve, and selection of the final products to be used. While in the middle of the construction, the Homeowner decided to expand the project to include new flooring over the stairs leading to the basement and patching and painting of the Living Room and Hallway. | $52k | Belleville, MI | |
Whole House Remodel in Ferndale | Jan 2015 | The Homeowner has asked us to assist with remodeling her entire home as the funds become available. We are doing the entire project in phases over a 2 year period. The projects completed so far include: -Design of a new covered porch on the front of the house. The construction is expected to begin Spring of 2015. -Patching and Painting of every wall and ceiling on the main floor, 2nd floor, and basement (partial ceiling only). -Re-glazing of bathtub and tile surround. -Installation of porcelain tile over the existing floor in the 2nd floor Bathroom and Foyer. -Replacement of the front entry door with a solid mahogany eclectic style entry door and mahogany storm door. -Reconstruction of both staircases between floors. -Replacement of all carpeting in the basement and over staircase. -Replacing of defective galvanized plumbing with copper plumbing from the basement to the 2nd floor. -Replacement of outlets and switches as requested. -Installation of granite countertop in the Kitchen. -Installation of stone tile backsplash in the Kitchen. -Complete Re-design of the Florida Room and a Trex deck addition on the rear of the house. Construction scheduled to begin Spring of 2015. -Replacement of basement windows with glass block. -Replacement of privacy fencing followed by staining (different colors on each side). | Ferndale, MI | ||
Royal Oak Chamber of Commerce Makeover | Jun 2014 | Interior: -Relocated all furniture and belongings to storage facility. -Demo of entire space to be remodeled. -Building of new stud walls including insulation as required. -Drywall installation, mudding, sanding, and painting. -Spray painting of the ceiling. -Removal and replacement of all electrical wiring-both low and high voltage-throughout the space. -Modifications to Heating and Cooling System as needed. -Modifications to plumbing including removal of obsolete equipment and installation of new underground plumbing. -Set up of furniture and equipment for the Chamber Staff. Exterior: Tuckpointing, priming, and painting of the brick, block, and trim on the exterior of the building. | Royal Oak, MI | ||
Gellerman House | Feb 2013 | -Sanding, Staining, and Sealing of 8' tall Mahogany Doors throughout the house. -Installation of Durock, Schluter Ditra Membrane, marble tile and grout in Foyer. -Staining and installation of Hardwood Floor Grates. | Milford, MI |