BETTENCOURT CONSTRUCTION LLC

General Contractor - St Petersburg, FL

Average rating

info

4.66

4.7

based on 27 online reviews

Average rating

info

4.66

4.7

based on 27 online reviews
based on 27 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Clearwater 2013

Jan 2014

Permit Number: BCP2013-12381 Permit Type: Construction Permit Permit Description: 1 & 2 Family Residence Addition

$30k

Clearwater, FL

Saint Petersburg 2012

Apr 2012

Permit Number: 12-04000249 Permit Type: BUILDING/RESIDENTIAL Permit Description: BUILDING MINOR ALTERATION April 5, 2012 1:15:10 PM l1lurry., Comments, 1 non-impact front door, 1-non-impact, SGD. 25% rule., April 5, 2012 12:21:47 PM tgmeache.

$2k

Saint Petersburg, FL

Clearwater 2012

Mar 2012

Permit Number: BCP2012-01137 Permit Type: Construction Permit Permit Description: Office Remodel

$40k

Clearwater, FL

Saint Petersburg 2011

Sep 2011

Permit Number: 11-09001076 Permit Type: BUILDING/RESIDENTIAL Permit Description: BUILDING MINOR ALTERATION REPLACE 1 'CLOPAY' GARAGE DOOR, 9/30/2011 11:29, aflovett., WWP AFTER THE FACT: REMOVE EXISTING TILE, ROOF AND REPLACE WITH ASPHALT SHINGLES., ROOF MUST BE NAILED TO CODE AND HAVE, SECONDARY WATER BARRIER 4/12 @20SQ., 9/30/2011 11:28

$600

Saint Petersburg, FL

Saint Petersburg 2011

Mar 2011

Permit Number: 11-02000634 Permit Type: BUILDING/RESIDENTIAL Permit Description: RESIDENTIAL ADDITIONS AND ALTERATIONS March 8, 2011 11:10:45 AM dgstack., PROJECT IS TO BRING 322SF REAR NON, PERMITTED ADDITION UP TO 2007 CODE. NEW, FOOTER UNDER EXISTING SLAB, ADD KNEE, WALL TO EXISTING WALL TO RAISE CEILING,, REPLACE CEILING JOISTS, INSULAT,DRYWALL,, INSTALL NEW CONNECTORS AT JOIST TO WALL, NEW J-BOLT AT SOLE PLATE., March 8, 2011 11:22:24 AM yksawyer., 2 NEW ELECTRIC CIRCUITS, FOR LTS, RECEP,, SMOKE DET., March 8, 2011 11:25:01 AM yksawyer., noc attached, April 20, 2011 9:01:35 AM aflovett., 1 RETURN, 1 SUPPLY., March 8, 2011 11:25:24 AM yksawyer., REROOF WITH MB ROOF. 3SQS, 1/4/12 PITCH., 1 STORY., March 8, 2011 11:25:36 AM yksawyer., PLANS ARE STORED IN STORAGE ROOM., March 8, 2011 11:37:46 AM yksawyer.

$15k

Saint Petersburg, FL

New Port Richey 2010

Jul 2010

Permit Number: 717025 Permit Type: COMM MINOR REMODL Permit Description: Active License Lacking 018997 COMM MINOR REMODL LOT SIZE BATHROOMS UNIT SQ FT 02139 TOTAL SQ FT 00000 VAL FEE 000000216.12 Active 009821 COMM MIN REMDL EL OUTLETS SAWPOLE SERVICE METER # VAL FEE 000000130.56 Active 014795 COMM MINR RMDL MK AIRCONDITION C HEATING C VAL FEE 000000130.56 Active 016961 COMM MINR RMDL PB FIXTURES LINES SEWER SYSTEM SEPTIC # WATER SOURCE VAL FEE 000000151.95 INTERIOR REMODEL, 4/22/10 INTAKE TO DR....DW 4/26/10 ZON COMPL TO FLOOD. RAD 4/28/10 TO COMM PLANS..DM 05/04/10 TO THE FIRE MARSHAL.RAW 5/5/10 RECEIVED BY FIRE MARSH. AS 5/6/10 APPROVED BY FIRE MARSH. SENT TO CENTRAL PERM. AS 5/6/10 TO ELECTRICAL.SMF 5/11/10 ELECTRICAL REJECTED,FAXED COMMENTS, BACK TO C/P 830 5/12/10 TO SMF.SMF 5/19/10 PLBG OK AS NOTED.TO MECH.SMF 5/19/10 MECH OK AS NOTED.NEED MECH CONTRACTOR TO SIGN ONTO APP. CALLED,REVIEWS COMPLETE,RESPOND.HOLD DRAW 17-20.SMF 6/18 CUSTMR HANDED IN ANSWRS....TO PLANS ..RMB/NPR 6/24/10 TO ELECTRICAL.SMF 6/28/10 ELECTRICAL OK BACK TO C/P 830 06/30/10 TO ME.RAW 07/02/10 STRUCTURAL OK.TO ENTRY.RAW 7/2/10 ENTRY TO INTAKE..JM 7/6/10 TALKED W/JANET NEEDS MECH TO SIGN ON APPL. TOTAL 871.06 INITIAL PERMIT DATA: *47514 ISSUE DATE: 042210 ISSUE OFFICE: W 7/12/10 MECHCL CONTRCTR SIGND ON TO APP---- FILED ..RMB/NPR 8-30-10 OK TO PREPARE CC (IF REQUESTED)..SS

$22k

New Port Richey, FL

Holiday 2010

Feb 2010

Permit Number: 706364 Permit Type: REMODEL GARAGE Permit Description: Active License Lacking 018997 REMODEL GARAGE LOT SIZE TOTAL SQ FT 00321 VAL FEE 000000070.68 Active 009821 REMODEL GARAGE EL OUTLETS SAWPOLE SERVICE PROG METER # VAL FEE 000000057.84 Active License Lacking 007893 REMODEL GARAGE MK AIRCONDITION HEATING VAL 600 FEE 000000057.84 NO CHNG TO SB'S/MUST MATCH EX FFE/PREF, 2/3/10 TO PLANS, CALLED CONT AND REQUESTED A SUB PKG, PY 02/17/10 PLANS OK, TO ENTRY. DJR 2/17/10 CALLED CONT, NDS SUB PKG B4 ISSUANCE, HOLD AT MY DESK TIL I R CV THAT PY NOTE: NEEDS TO BRING LEGIBLE COPIES OF WINDOW NOA AT PICKUP. 07/30/10 CC OK,IF REQUESTED...HJW INITIAL PERMIT DATA: *42989 ISSUE DATE: 012910 ISSUE OFFICE: W

$7k

Holiday, FL

Saint Petersburg 2009

Oct 2009

Permit Number: 09-10000851 Permit Type: BUILDING/RESIDENTIAL Permit Description: October 29, 2009 10:27:32 AM tymiddle., RE-DO FRONT PORCH AREA AND STUCCO HOME 1, TRUSS OVER BACK FLAT DECK ROOF, January 27, 2010 3:55:41 PM lmbutler., REC'D NOTARIZED LETTER FROM CONTRACTOR, BETTENCOURT CONSTRUCTION, LLC REQUESTING, REMOVAL FROM PERMIT (SEE SCANNED, LETTER), PERMIT ON HOLD PENDING CHANGE, OF CONTRACTOR., received notarized letter to put, bettencourt as the contractor again to, complete the project and call in final, inspections March 23, 2010 8:47:45 AM, epchrist., noc received., November 3, 2009 12:14:50 PM yksawyer., October 29, 2009 10:34:07 AM tymiddle., PLANS STORED IN PLAN BOX 10/09

$26k

Saint Petersburg, FL

Saint Petersburg 2009

Nov 2009

Permit Number: 09-11000060 Permit Type: BUILDING/RESIDENTIAL Permit Description: November 3, 2009 9:17:38 AM l1lurry., addition to enlarge garage and master, bed romm and attach both truss over, entire existing roof., May 11, 2010 4:01:12 PM l1lurry., Plumbing permit is on hold pending, contractor of record. Received a letter, from Experts in Plumbing stating that he, has not completed plumbing job that Joe, Ellis Plumbing is on the job and has, completed the job under his licenses., RECEIVED NOTARIZED LETTER AND CERTIFIED, MAIL RECEIPT REMOVING EXPERTS IN, PLUMBING., May 14, 2010 9:15:19 AM g1strait., ******REVISION ELECTRIC SERVICE UPGRADE, 200 AMPS, April 30, 2010 11:32:24 AM aflovett., November 3, 2009 9:18:25 AM l1lurry., wiring to code. adding 2-new circuits., noc attached, April 2, 2010 10:26:43 AM aflovett., REVISED 07/12/10 INSTALL NEW A/C SYTEM, CHANGE OUT 3.5TON SPLIT VERTICAL W/5KW, 15 SEER,5 NEW DUCT RUNS,IN ADDITION,1, RETURN.July 12, 2010 2:52:55 PM, TYMIDDLE., November 3, 2009 9:20:40 AM l1lurry., install 1-rtn, 4-supplies., Install 70 cfm bath fan, 5 supplies., January 15, 2010 12:40:55 PM SALehman., November 3, 2009 9:19:30 AM l1lurry., change 1-w/c, 1-shower,2-lavs, install, 6' of sewer line and 10' of water line., November 3, 2009 9:20:59 AM l1lurry., plans filed in plan room.

$52k

Saint Petersburg, FL