Cost

Home

Fredericksburg Flooring Job

Dec 2014

This project was for the installation of laminate flooring and to convert an opening from having a door to a standard walk through. This project presented a major challenge in that a portion of the floor was to extend to a recently done addition. The addition builder had not installed the sub-floor where the two floors met at the time of our install. The addition floor ran approximately a 1/4" at it's best point to 1" at its worst above the existing floor line. To overcome this discrepancy we cut back the existing sub-floor to create a gentler slope between the floors of the addition and original structure. We then fastened metal lath to the floors and poured self leveling concrete to bring the floors within acceptable standards. This project included labor and raw construction materials, laminate flooring and underlayment was provided by our client.

$3k

Fredericksburg, VA

Hartwood Beam & Post Replacement

Oct 2014

Remove and replace old porch posts with new posts. Remove rotten portion of structural porch beam and replace with pressure treated beam. Project included all labor and materials.

$3k

Fredericksburg, VA

Warranten Jewlers

Aug 2014

This projects scope of work included the installation of a multi piece large crown moulding; framing for and arched opening; drywall installation; and painting for the feature wall of this store.

$3k

Warrenton, VA

Stafford Flooring Job

Aug 2014

This project entailed replacing the existing vinyl in the kitchen with 12x12 porcelain tile. While removing the sheet vinyl water damage to the sub-floor was found. Further inspection found the source of the water infiltration to be a door leading out to the deck. The door was improperly installed without flashing allowing water to come into the structure. A change order was authorized for removal and replacement of the door, damaged drywall around the door and to replace the water damaged sub-floor. This project included all labor and material except the tile which was provided by our customer.

$4k

Stafford, VA

King George Built-in

Jun 2014

This project included the fabrication, finishing, and installation of a custom built-in book case with a white oak hand rubbed top. Installation and painting of tongue and groove wainscoting. Modification of the existing crown moulding and installation of new crown moulding to cap the built in. The project as quoted includes all labor and materials.

$8k

King George, VA

Aquia Water Damage Repair

Jun 2014

This project entailed repairing rotten trim and sills on two upper windows. The windows were flashed, drip caps installed and all replacement trim was PVC. Project was for labor and materials.

$2k

Stafford, VA

Southpoint Cove

May 2014

Install customer supplied cove moulding and light rail moulding on cabinets in reception area.

$609

Fredericksburg, VA

Spotsylvania Kitchen Remodel

May 2014

This project was a kitchen/ laundry room remodel. Included in the project was permits, labor, and material to: install new cabinetry; replacing some existing cabinetry with ungraded cabinetry; upgrading of hardware on cabinets to be left in place; custom finish carpentry; custom storage solutions; counter tops; back splash; floor coverings; minor framing alterations; electrical, plumbing, and venting alterations; and drywall repair. Appliances and custom lighting fixture material prices were not included in the price however installation was included.

$46k

Spotsylvania, VA

Stafford Deck

Apr 2014

The scope of work for this project was to construct a 250SQFT wood deck with stairs.

$10k

Stafford, VA