Bomar Remodeling of Columbus

General Contractor - Sterrett, AL

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Bathroom Remodel

Apr 2015

Removed hardwood flooring in bathroom and repaired sub floor. Installed new tile flooring, new toilet, and new vanity. Sanded and painted ceiling and walls

$1k

Pickerington, OH

New Flooring in two Bathrooms

Mar 2015

Removed old flooring and installed new flooring in master bathroom and second bathroom

$2k

Dublin, OH

New Basement Bathroom

Feb 2015

Installed shower, new toilet, vanity, and flooring. Ran new electric and plumbing

$4k

Powell, OH

Laundry Room Floor

Oct 2014

Removed old flooring and installed new tile

$900

Dublin, OH

Total Bathroom Remodel

Jul 2014

Removed old shower and tub and gutted walls. Installed new tile on shower walls, floor, and around tub. Installed new faucet fixtures. Tiled behind mirrors up to ceiling.

$6k

Dublin, OH

New Deck

Jul 2013

Installed huge deck with custom railings and open staircase

Westerville, OH

Finished Basement

Apr 2016

We added a bedroom, media room, hallway and new bathroom to an unfinished basement.

$330k

Sterrett, AL