Mid-Cal Construction

Dock Building & Repair Contractor - Stockton, CA

Average rating

info

4.67

4.7

based on 3 online reviews

Average rating

info

4.67

4.7

based on 3 online reviews
based on 3 ratings

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Oakwood Shores Dock, Ramp and Gangway

May 2014

Aluminum gangway and dock on Oakwood Shores Lake.

Manteca, CA

Ipe Dock on Lake Tulloch

Feb 2014

Ipe (Brazilian hardwood) decked dock located on Lake Tulloch. Stiff-arm and cable anchoring. Aluminum framed gangway decked with ipe.

Copperopolis, CA

Aluminum gangway

Feb 2014

Aluminum gangway with safety rail and transition plate.

Stockton, CA

Lake Tulloch Covered Dock

Feb 2014

Aluminum framed dock with vinyl decking and boat cover.

Jamestown, CA

Waldo Point Harbor Seawall

Jan 2014

Mid-Cal Construction has started a 4 year seawall construction project at Waldo Point Harbor located at the northern end of Richardson Bay in Sausalito, California. The project consists of installing 3000 feet of sheet piling. The project will also include constructing new piers, docks and pile driving. The seawall construction is projected to be complete by 2015.

Sausalito, CA

Belvedere Redwood Deck

Oct 2013

Redwood deck project with cable railing.

Belvedere Tiburon, CA

Belvedere Dock and Pier

May 2013

Ipe dock and pier with cable railing.

Belvedere Tiburon, CA

Discovery Bay Deck

Mar 2013

Vinyl deck replacement with cable railings.

Discovery Bay, CA

Vinyl Dock, Lake Tulloch

Jan 2013

Dock with vinyl decking, gangway and stiff-arm anchor.

Copperopolis, CA