Jefferson State Restoration

Remodeling Contractor - White City, OR

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

master bath remodel

May 2015

demolition of existing bathroom. frame for tile shower, including tile pan. add backing for glass doors. frame for shelves in shower including a foot rest. prepare floor for tile. install tile shower floor and wainscoating. install new cabinet with new counter sinks and faucets. install new window. Prime and two colors of paint.

$4k

Brooklyn, NY

laminate floor

Feb 2015

install acacia wood laminate floor. as you can see the variety of tones in the floor that are distributed nicely. To successfully accomplish this, several boxes of flooring has to be used to ensure a nice pattern and not a quilt look. this did include installing the pad as well

$2k

Brooklyn, NY

Corona Ave Medford Ore drywall repair and paint interior

Oct 2015

repair fire tape ( fire tape is the code required tape for fire block.) on existing drywall in garage. replace damaged sheets of drywall on ceiling of garage. repair damaged sheet rock in interior of home and re texture. primer all new repaired drywall interior remove and replace fixtures and door knobs mask off interior of home cover and protect carpet and wood laminate floor. spray med grade Sherwin Williams paint from Sherwin Williams. clean up all debris and remove from site.

$2k

E Gull Lake, MN