Hasson Construction

General Contractor - Winter Park, FL

Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Room Addition

Dec 2014

1. Demolition: demolition of existing upper siding. 2. Insulation: ceiling with R30 Batten. Walls with R-13. 3. Framing: Provide framing and install prior to drywall installation. 4: Drywall: Provide drywall and install, tape and mud, sand and texture as desired. 5. Duct work: provide opening for an air duct to pass through. 6. Concrete: Raise the floor by 4 inches to match the floor level of the house with an aggregate concrete mix. 7. Tongue and Groove ceiling: provide smooth cedar T&G, 1x6 for the ceiling and install.

$7k

Winter Park, FL