General Contractor - Shawnee, KS
5.0
I was raised in the construction field my whole life. I have learned a lot beside my dad, I am a third generation carpenter. I care about my customers and want them to receive quality work. When I start a project I finish it. I do not jump around from job to job. I have more than 10 years of experience. I do a lot of different things such as kitchens, bathrooms, basements, decks, windows, doors. I offer Onyx Collections ordered Directly from me and installed by me into your home. I have a facebook page dedicated for my business. It is Facebook.com/trossconstruction come check it out.
Ralph T.
Excellent 10+
Address
5219 Barton Dr
Shawnee, KS 66203
Photo | Project | Date | Description | Cost | Home |
---|---|---|---|---|---|
Deck job | Aug 2014 | Built deck top is 17 x 12 and lower is 20 x 10 | Olathe, KS | ||
Gutter job | Jul 2014 | painted and installed gutters | Shawnee, KS | ||
Master Bath Tile Joe | Apr 2014 | tile job | Shawnee, KS | ||
Office partial wall and door | Jan 2014 | This is a job that the home owner wanted more privacy from the living room to his office. We installed a partition wall/door in between the two. We hung/finished the sheet rock, installed the trim, primed and painted the wall, trim and doors. We also changed out one closet door slab and installed another door slab that was between the office and kitchen. | Shawnee, KS | ||
Bathroom Remodel | Jan 2014 | We completely removed the entire bathroom and hall closet in order to make the bathroom bigger. We moved the plumbing around installed a new shower faucet and drain. We installed cement board where the shower went and sheet rock/finish walls, ceiling every wear else. Primed every thing and painted. Installed cement board on the floor to prep for tile. We then installed the shower pan/surround, trim and shower doors. This shower system is from the onyx series. We then installed the tile on the floor and grout. We installed the vanity, toilet and hooked up all the plumbing. | Shawnee, KS | ||
Door installation july 2014 | Jan 2014 | Remove old front door and paint and install new front door. We had to remove the old storm door and saved it to reinstall once the new door was in. Customer picked out the new door, hardware and paid for it we went to the store and picked it up. Had the door and storm installed in the first day and painted it on the second day. | Shawnee, KS | ||
Entry way tile job 2014 | Jan 2014 | Removed some hardwood floor and installed tile. Customer supplied the tile and grout we went with them to pick it up. We supplied the cement board , thin set and labor. | Shawnee, KS | ||
TIle job | Jan 2014 | We removed the old floor, prep for the new floor. Installed the new tile and grout, installed shoe trim around the cabinets. Customer supplied the material and we supplied the labor. | Overland Park, KS | ||
Railing | Oct 2013 | Installed spindles for railing. | Shawnee, KS |