Project Gallery

A table showing the projects done by the pro

Photo

Project

Date

Description

Cost

Home

Deck job

Aug 2014

Built deck top is 17 x 12 and lower is 20 x 10

Olathe, KS

Gutter job

Jul 2014

painted and installed gutters

Shawnee, KS

Master Bath Tile Joe

Apr 2014

tile job

Shawnee, KS

Office partial wall and door

Jan 2014

This is a job that the home owner wanted more privacy from the living room to his office. We installed a partition wall/door in between the two. We hung/finished the sheet rock, installed the trim, primed and painted the wall, trim and doors. We also changed out one closet door slab and installed another door slab that was between the office and kitchen.

Shawnee, KS

Bathroom Remodel

Jan 2014

We completely removed the entire bathroom and hall closet in order to make the bathroom bigger. We moved the plumbing around installed a new shower faucet and drain. We installed cement board where the shower went and sheet rock/finish walls, ceiling every wear else. Primed every thing and painted. Installed cement board on the floor to prep for tile. We then installed the shower pan/surround, trim and shower doors. This shower system is from the onyx series. We then installed the tile on the floor and grout. We installed the vanity, toilet and hooked up all the plumbing.

Shawnee, KS

Door installation july 2014

Jan 2014

Remove old front door and paint and install new front door. We had to remove the old storm door and saved it to reinstall once the new door was in. Customer picked out the new door, hardware and paid for it we went to the store and picked it up. Had the door and storm installed in the first day and painted it on the second day.

Shawnee, KS

TIle job

Jan 2014

We removed the old floor, prep for the new floor. Installed the new tile and grout, installed shoe trim around the cabinets. Customer supplied the material and we supplied the labor.

Overland Park, KS

Entry way tile job 2014

Jan 2014

Removed some hardwood floor and installed tile. Customer supplied the tile and grout we went with them to pick it up. We supplied the cement board , thin set and labor.

Shawnee, KS

Railing

Oct 2013

Installed spindles for railing.

Shawnee, KS