Standard Services | Quantity | Low | High | ||
---|---|---|---|---|---|
What you can expect | |||||
Range per line: | $452.37 | $561.60 | |||
Range for this type of project: | $452 | $562 | |||
Estimate: $507 | |||||
Water Line Labor, Basic | 4 hours | $353 | $428 | ||
Labor cost, under typical conditions, for complete wall installation. T connector will be installed, along with a single 30' water line to the existing system and a shutoff valve. New line will be connected, routed, secured, and leak-tested to verify optimal operation. Rate is inclusive of all aspects of the project, such as thorough planning, acquisition of equipment and material, preparation and protection of project site, and meticulous cleanup. | |||||
Water Line Job Supplies | 1 line | $76 | $86 | ||
Requisite supplies for the job, including fittings, mounting hardware, and connectors. | |||||
Water Line Equipment Allowance | 1 job | $23 | $47 | ||
Daily rental of specialty equipment for maximum quality and efficiency. These include pipe cutter and threader, tubing cutter, brazing kit, and pipe wrenches. Consumable equipment elements not included. | |||||
Water Line Debris Disposal | 1 line | $11 | $13 | ||
Responsible disposal of all project debris, including the cost to load and haul old materials, installation waste, and any other refuse. | |||||
Optional Services | |||||
Option: Remove Water Line | 2 hours | $172 | $209 | ||
Water supply will be shut off. Single-supply water line will be disconnected, or cut and removed, up to 30' from nearest connection branch. Line will be capped, and remaining supply system tested for leaks. Asbestos handling, modifications to structure, and any required surface restoration will incur additional fees. |
cost to install a water line | |
National Avg. Materials Cost per line | $84.23 |
National Avg. Cost (labor and materials) for 1 line | $526.28 |
National Cost Range (labor and materials) for 1 line | $469.58 - $582.98 |