Standard Services | Quantity | Low | High | ||
---|---|---|---|---|---|
What you can expect | |||||
Range per line: | $650.13 | $802.29 | |||
Range for this type of project: | $650 | $802 | |||
Estimate: $726 | |||||
Water Line Labor, Basic | 6 hours | $535 | $648 | ||
Labor cost, under typical conditions, for complete in-wall/under-floor installation. Coupling will be installed and up to 30' of single piping laid. Rerouted line will be connected, routed, and secured. Leak testing will be conducted and optimal operation verified. Specialty services, such as demolition, structural modifications, and surface restoration will incur additional fees. Rate is inclusive of all aspects of the project, such as thorough planning, acquisition of equipment and material, preparation and protection of project site, and meticulous cleanup. | |||||
Water Line Job Supplies | 1 line | $90 | $102 | ||
Requisite supplies for the job, including fittings, mounting hardware, and connectors. | |||||
Water Line Equipment Allowance | 1 job | $26 | $52 | ||
Daily rental of specialty equipment for maximum quality and efficiency. These include pipe cutter and threader, tubing cutter, brazing kit, and pipe wrenches. Consumable equipment elements not included. |
cost to move a water line | |
National Avg. Materials Cost per line | $90.22 |
National Avg. Cost (labor and materials) for 1 line | $680.90 |
National Cost Range (labor and materials) for 1 line | $609.57 - $752.23 |