Standard Services | Quantity | Low | High | ||
---|---|---|---|---|---|
What you can expect | |||||
Range per heater: | $1,669.30 | $1,923.27 | |||
Range for this type of project: | $1,669 | $1,923 | |||
Estimate: $1,796 | |||||
Tankless Water Heater Cost | 1 heater | $1,105 | $1,242 | ||
Cost of 8.5-gpm tankless gas water heater (35F temperature rise). 0.92 energy factor and digital controller. Natural gas supply and 3" vent connection required at installation site. 5-year limited warranty guarantees excellence. | |||||
Tankless Water Heater Labor, Basic | 6 hours | $524 | $636 | ||
Labor cost, under typical conditions, for complete installation. Heater will be mounted, secured, and vent connected to ducting. Unit will be connected to supply lines, checked for leaks, and cycle-tested to ensure optimal operation. Surface demolition, structural modifications, and restoration (if needed) will incur additional fees. Rate is inclusive of all aspects of the project, such as thorough planning, acquisition of equipment and material, preparation and protection of project site, and meticulous cleanup. | |||||
Tankless Water Heater Job Supplies | 1 heater | $40 | $45 | ||
Requisite supplies for the job, including connectors, fittings, and mounting hardware. | |||||
Tankless Water Heater Debris Disposal | 1 heater | $14 | $16 | ||
Unit will be detached from adjacent components, removed from premises, and disposed of in a safe and legal manner. | |||||
Optional Services | |||||
Option: Remove Water Heater | 1 hour | $19 | $122 | ||
Unit will be detached from adjacent components, removed from premises, and disposed of in a safe and legal manner. |
cost to install a tankless hot water heater | |
National Avg. Materials Cost per heater | $1,218.50 |
National Avg. Cost (labor and materials) for 1 heater | $1,864.65 |
National Cost Range (labor and materials) for 1 heater | $1,732.83 - $1,996.47 |