Standard Services | Quantity | Low | High | ||
---|---|---|---|---|---|
What you can expect | |||||
Range per square foot: | $6.29 | $9.59 | |||
Range for this type of project: | $1,888 | $2,877 | |||
Estimate: $2,383 | |||||
Mortar Bed Labor, Basic | 24 hours | $1,493 | $2,423 | ||
Labor cost, under typical conditions, for complete installation. Framing and screed strips will be secured, then mortar will be prepared, uniformly applied, and leveled. Fee is inclusive of all aspects of the project, such as thorough planning, acquisition of equipment and material, preparation and protection of installation site, and meticulous cleanup. | |||||
Mortar Bed Job Supplies | 320 square feet | $385 | $438 | ||
Requisite supplies for the job, including fabrication and polishing disposables, manufacturer-recommended underlayment, fasteners, adhesives, and surface sealants. | |||||
Mortar Bed Equipment Allowance | 1 job | $11 | $16 | ||
Daily rental of specialty equipment for maximum quality and efficiency. These include 5+ cuft, heavy-duty mortar box with electric drill-driven mixer. Consumable equipment elements not included. | |||||
Mortar Bed Debris Disposal | 300 square feet | $222 | $252 | ||
Responsible disposal of all project debris, including the cost to load and haul old materials, installation waste, and any other refuse. | |||||
Optional Services | |||||
Option: Remove Tile | 39 hours | $619 | $3,912 | ||
Tile will be detached from adjacent surfaces, broken into portable segments, and removed from premises. |
cost to install a mortar bed | |
National Avg. Materials Cost per square foot | $1.33 |
National Avg. Cost (labor and materials) for 300 square foot | $2,473.27 |
National Cost Range (labor and materials) for 300 square foot | $1,960.22 - $2,986.31 |