Standard Services | Quantity | Low | High | ||
---|---|---|---|---|---|
What you can expect | |||||
Range per transition: | $76.86 | $117.33 | |||
Range for this type of project: | $461 | $704 | |||
Estimate: $583 | |||||
Door Transition Labor, Basic | 6 hours | $336 | $546 | ||
Labor cost, under typical conditions, for complete installation. Door will be planed for proper clearance, and transition trip fit and secured. Fee is inclusive of all aspects of the project, such as thorough planning, acquisition of equipment and material, preparation and protection of installation site, and meticulous cleanup. | |||||
Door Transition Job Supplies | 6 transitions | $72 | $82 | ||
Requisite supplies for the job, including manufacturer-recommended underlayment, fasteners, adhesives, and surface sealants. | |||||
Door Transition Equipment Allowance | 1 job | $52 | $76 | ||
Daily rental of specialty equipment for maximum quality and efficiency. These include pneumatic-finish nailer, 10" miter saw, electric jigsaw, 3" belt sander, and 3-1/4" electric planer. Consumable equipment elements not included. |
cost to install a threshold transition strip | |
National Avg. Materials Cost per transition | $13.37 |
National Avg. Cost (labor and materials) for 6 transition | $604.74 |
National Cost Range (labor and materials) for 6 transition | $478.72 - $730.77 |